Legislation Details
|
Type:
|
Procurement Contract/Change Order
|
Status:
|
Passed
|
|
On agenda:
|
6/12/2024
|
Final action:
|
6/12/2024
|
|
Title:
|
Contract: Bridge Inspection Professional Services (HDR Engineering, Inc.)
|
|
TO: |
Board of Trustees |
|
THROUGH: |
Jay Fox, Executive Director |
|
FROM: |
Jared Scarbrough, Director of Capital Design & Const |
|
PRESENTER(S): |
Grey Turner, Manager of Civil Engineering & Design |
|
|
|
TITLE:

title
Contract: Bridge Inspection Professional Services (HDR Engineering, Inc.)
end

AGENDA ITEM TYPE:
Procurement Contract/Change Order

RECOMMENDATION:
Approve and authorize the Executive Director to execute a contract and associated disbursements with HDR Engineering, Inc. to provide bridge inspection services 3 year contract with two - one- year options for the total amount of $1,642,000 for all 5 years.

BACKGROUND:
FRA requires the inspection of UTA bridges to occur every year. This new contract will be a 3-year contract with two - one year options to provide these inspection services, as we have previously done. Bridge inspections require physical inspection of bridges and associated components with photos, documentation, and ratings to identify potential hazards/concerns. This procurement was conducted using a competitive Request for Qualifications (RFQu)process.

DISCUSSION:
UTA issued an RFQu for the bridge inspection program and received three proposals. HDR Engineering Inc. was selected using a qualifications-based selection system. This contract is for HDR Engineering, Inc. to provide yearly inspections with subsequent reports on the UTA-owned bridges for the next 3 years with 2 - 1 year options.

CONTRACT SUMMARY:
|
Contractor Name: |
HDR Engineering, Inc. |
|
Contract Number: |
24-03826VW |
|
Base Contract Effective Dates: |
June 12, 2024 - June 30, 2027 for base contract. |
|
Extended Contract Dates: |
July 1, 2027 - June 30, 2029, if both options are exercised. |
|
Existing Contract Value: |
N/A |
|
Amendment Amount: |
N/A |
|
New/Total Contract Value: |
$1,642,500 for the total five years provided both options are exercised. |
|
Procurement Method: |
Request for Qualifications |
|
Budget Authority: |
Approved 2024 Capital Budget |
|
|
|
ALTERNATIVES:
Bridge inspections do not occur every year and UTA falls out of FRA compliance.

FISCAL IMPACT:
|
Capital Plan for SGR359 Bridge Rehabilitation & Maintenance. |
|
|
|
• Approved Capital Plan (2024-2028): $2,264,000 |
|
• Base 3-year contract with HDR Engineering, Inc.: $1,072,500 ($983,068.88 HDR Estimate + $89,431.12 Prov. Sum) o 2024 (last 6 months): $178,750.00 o 2025: $357,500.00 o 2026: $357,500.00 o 2027 (first 6 months): $178,750.00 • Option Year 1 - 2027 (last 6 months): $142,500 • Option Year 1 - 2028 (first 6 months): $142,500 • Option Year 2 - 2028 (last 6 months): $142,500 • Option Year 2 - 2029 (first 6 months): $142,500 |
|
• Approved Requisition: $1,642,500 |

ATTACHMENTS:
Contract 24-03826VW
|