Title: Change Order: On-Call Systems Maintenance Contract Task Order #24-003 - 2024 General Engineering and Maintenance Support (Rocky Mountain Systems Services)
Attachments: 1. Change Order: On-Call Systems Maintenance Contract Task Order #24-003 - 2023 General Engineering and Maintenance (Rocky Mountain Systems Services)

TO:                

Board of Trustees

THROUGH:  

Jay Fox, Executive Director

FROM:          

Dave Hancock, Chief Service Development Officer

PRESENTER(S):

Dean Hansen, Systems Engineering Manager

 

TITLE:                                                                                                                                                                         

title

Change Order: On-Call Systems Maintenance Contract Task Order #24-003 - 2024 General Engineering and Maintenance Support (Rocky Mountain Systems Services)

end

 

AGENDA ITEM TYPE:                                                                                                                        

Procurement Contract/Change Order

RECOMMENDATION:                                                                                                                       

Approve task order #24-003 (2024 General Engineering and Maintenance) to on-call systems maintenance contract with Rocky Mountain System Services (RMSS) and authorize the Executive Director to execute task order and associated disbursements in the not to exceed amount of $300,000.                     

BACKGROUND:                                                                                                                                 

In March of 2021, UTA executed contract 20-03382VW with Rocky Mountain Systems Services (RMSS) for on-call systems maintenance. The term of this contract is for three years with two one-year term options. RMSS was selected based on best value procurement methodology. The UTA Board of Trustees approved the contract on February 24, 2021, and it was fully executed on March 2, 2021. On November 18, 2022, UTA executed change order #23-001 to exercise the two, one-year term options, ending on December 31, 2025. The original contract value was estimated at $15,000,000. On April 12, 2023, the UTA Board of Trustees approved an increase of the estimated contract value to $30,000,000.

Typical task orders under this contract include:

                     Support for rail and maintenance of way systems

                     Upgrades, repairs, analysis, and training of train control systems

                     Monitoring and analysis of stray current

                     Repair, maintenance, and training of overhead contact systems and traction power substations

                     Inspection, connection, repair, of traffic signals

DISCUSSION:                                                                                                                                      

This task is for Systems Engineering and/or Maintenance Support on State of Good of Repair projects including:

                     SGR-397: Traction Power Substation Replacement

                     SGR-398: Overhead Catenary System

                     SGR-403: Train Control Rehab and Replacement

                     SGR-404: Rail Switches and Trackwork Controls

                     SGR-410: Fiber Rehab and Replacement

                     SGR-047: Stray Current

 

Examples of the Scope of work to be completed under this task include:

Train Control System Services:

                     Design, material procurement, installation, testing, integration, and final commissioning for train control systems and components as required by UTA to support capital projects.

                     Software development, modifications, and simulation.

                     Vital and non-vital communication troubleshooting, routine and emergency maintenance, and upgrades.

                     Installation and repairs of light rail and commuter rail switch heaters.

 

Overhead Catenary System Services:

                     Infrastructure repairs, upgrades, preventative/routine maintenance and/or emergency services.

 

Traction Power Substation Infrastructure Services:

                     Upgrade systems as determined by UTA, including material procurement, wire installation, equipment replacement and troubleshooting, communication configuration and installation, integration with UTA’s Supervisory Control and Data Acquisition (SCADA) control system

                     Infrastructure repairs, minor upgrades, preventative/routine maintenance and/or emergency services.

 

Signal and Grade Crossing Support:

                     Assist with UTA and non-UTA design and construction projects including projects that interface and/or foul UTA facilities and require grade crossings and/or train control systems be taken in and out of service to support such projects during construction.

 

UTA-Owned Utility Locating Services:

                     Locate buried utilities for projects that interface with or are near UTA owned facilities that do not show up on Blue Stakes of Utah.

 

Utility Interference Monitoring and Mitigation Services:

                     Provide UTA with data logging, monitoring, reporting, analysis, and recommendations for instances where UTA equipment may receive interference and in some cases damage to their equipment from third-party utilities.

Training and Materials:

                     Provide training materials and curriculum including in-person and on-the-job training to UTA personnel as determined by UTA Systems Engineering and Maintenance of Way.

 

*Special note, this task order will expire on October 31, 2024, before which point, a new on-call contract will be established, and General Engineering services will be resubmitted under a new contract.

CONTRACT SUMMARY:                                                                                                                   

Contractor Name:                          

Rocky Mountain Systems Services

Contract Number:                          

20-03382-24-003

Base Contract Effective Dates:     

March 3, 2021 through December 31, 2025 (including exercised option years)

Extended Contract Dates:            

TO 24-003 period of performance Jan 1, 2024-Oct 31, 2024

Existing Contract Value:                

$22,889,769

Amendment Amount:                   

Not to exceed $300,000

New/Total Contract Value:

$23,189,769

Procurement Method:                  

RFP best value modification

Budget Authority:                            

5-Year Capital Plan

ALTERNATIVES:                                                                                                                                    

Disapprove task order. This would prevent UTA from receiving the on-call support needed and leave RMSS without the necessary time and materials to carry out general system maintenance activities.

FISCAL IMPACT:                                                                                                                                

Funding for this task order is included in the 2024 Capital budget.

ATTACHMENTS:                                                                                                                                

Task Order #24-003