TO: |
Board of Trustees |
|
THROUGH: |
Jay Fox, Executive Director |
|
FROM: |
Mary DeLoretto, Chief Service Development Officer |
|
PRESENTER(S): |
Jared Scarbrough, Acting Director of Capital Construction |
|
|
|
TITLE:

title
Change Order: On-Call Systems Maintenance - Task Order #026 - Signal Design for 5300 South and 5400 South TRAX Crossover Conversions (Rocky Mountain Systems Services)
end

AGENDA ITEM TYPE:
Procurement Contract/Change Order

RECOMMENDATION:
Approve task order #026 (5300 S. and 5400 S. Signal Design) to the on-call systems maintenance contract with Rocky Mountain System Services (RMSS) and authorize the Executive Director to execute the task order and associated disbursements in the amount of $339,007.

BACKGROUND:
In November 2020, UTA released a request for procurement (RFP) for an on-call maintenance contractor focused specifically on systems engineering and maintenance support. Rocky Mountain Systems Services was selected as the winner based on overall scoring using the best value format. The UTA Board of Trustees approved the contract and authorized the Executive Director to execute the contract with RMSS on February 24, 2021. This contract is for three years with two, one-year options.
Typical task orders under this contract include:
• Subject matter experts to support UTA rail systems and MOW systems departments.
• Train Control System upgrades, repairs, analysis, and training.
• Stray Current monitoring and analysis.
• OCS/TPSS repair, maintenance, and training.
• Traffic Signal inspections, connections, repairs, and coordination.

DISCUSSION:
UTA Staff is requesting approval of task order #026 with RMSS. This task order is to
convert two existing non-powered, electric lock crossovers into two independent, signalized, powered interlockings with remote controls and indications to the back office. The two locations to be converted are:
1. 5300 South Crossover - 2 Switches - TRAX Mainline - Murray
2. 5400 South Crossover - 2 Switches - TRAX Mainline - Murray.
This task order is for the signal design portion of this project. The train control material procurement and train control construction portions of this project will be executed under separate task orders. The procurement and construction of the actual trackwork for this project will be executed under a separate contract.

CONTRACT SUMMARY:
|
Contractor Name: |
Rocky Mountain Systems Services |
|
Contract Number: |
20-03382VW-26 |
|
Base Contract Effective Dates: |
March 3, 2021 through December 31, 2025 |
|
Extended Contract Dates: |
N/A |
|
Existing Contract Value: |
$6,742,874 |
|
Amendment Amount: |
$339,007 |
|
New/Total Contract Value: |
$7,081,881 |
|
Procurement Method: |
RFP best value method for on-call master contract |
|
Budget Authority: |
Approved 2022 capital project budget |
|
|
|
ALTERNATIVES:
The do-nothing alternative would prevent this SGR improvement from occurring, limiting UTA’s ability to keep the system in a state of good repair.

FISCAL IMPACT:
This budget is included in the 2022 Capital Program.

ATTACHMENTS:
Task order #26