Type: Procurement Contract/Change Order Status: Passed
In control: Board of Trustees
On agenda: 9/10/2025 Final action: 9/10/2025
Title: Contract: S70 Articulation Bearing Overhaul Kits (Hubner Manufacturing Corp.)
Attachments: 1. Contract: S70 Articulation Bearing Overhaul Kits (Hubner Manufacturing Corp.)

TO:                

Board of Trustees

THROUGH:  

Jay Fox, Executive Director

FROM:          

Jared Scarbrough, Acting Chief Capital Services Officer

PRESENTER(S):

Kyle Stockley, Director of Capital Vehicles

 

 

 

TITLE:                                                                                                                                                                         

title

Contract: S70 Articulation Bearing Overhaul Kits (Hubner Manufacturing Corp.)

end

 

AGENDA ITEM TYPE:                                                                                                                        

Procurement Contract/Change Order

RECOMMENDATION:                                                                                                                       

Approve and authorize the Executive Director to execute contract 25-03949 and associated disbursements with Hubner Manufacturing Corp., in the amount of $2,051,782.40 to furnish and deliver 83 articulation joint overhaul kits for UTA’s S70 Light Rail Vehicles.                     

BACKGROUND:                                                                                                                                 

UTA operates 77 Siemens S70 Light Rail Vehicles (LRVs), each designed with articulation sections that allow the cars to safely navigate the sharp curves of our light rail system. These articulation components require periodic overhauls as part of the fleet’s ongoing maintenance program.

To ensure cost control and schedule reliability, UTA performs the overhaul work in-house while purchasing the necessary parts and materials from an outside vendor. An Invitation for Bid was recently issued for the supply of articulation overhaul kits. Following a competitive evaluation process, Hubner Manufacturing Corp. was selected as the winning bidder.

DISCUSSION:                                                                                                                                      

The contract, in the amount of $2,051,782.40, provides for the supply and delivery of 83 overhaul kits to support the continued safe and efficient operation of the S70 fleet.

The kits will be delivered in batches over the next three years. Overhaul work - including separating vehicle sections and replacing articulation bearings and associated components – will be carried out by UTA personnel utilizing UTA’s existing equipment and facilities.

The contract pricing has been determined to be fair and reasonable based on both a UTA independent cost estimate and the performance of a price analysis.

CONTRACT SUMMARY:                                                                                                                   

Contractor Name:                          

Hubner Manufacturing Corp

Contract Number:                          

25-03949

Base Contract Effective Dates:     

Effective after the last signature received –

January 1, 2027

Extended Contract Dates:            

N/A

Existing Contract Value:                

N/A

Amendment Amount:                   

N/A

New/Total Contract Value:

$2,051,782.40

Procurement Method:                  

IFB

Budget Authority:                            

Approved 2025 Capital Budget

 

 

ALTERNATIVES:                                                                                                                                    

The S70 LRV articulation joints require periodic replacement of components to ensure safe and reliable operation of the vehicles. Without this purchase, necessary bearing replacements would be delayed or deferred, resulting in reduced fleet availability and potential service disruptions.

FISCAL IMPACT:                                                                                                                                

This contract is for a one-time purchase of additional articulation bearing overhaul kits to be delivered over three years 2025, 2026, and 2027 utilizing the SGR040 budget.

                     2025 Contract Total: $202,341.60

                     2026 Contract Total: $1,387,080.60

                     2027 Contract Total: $462,360.20

Total contract value: $2,051,782.40