Legislation Details

File #: 23-03750VW   
Type: Procurement Contract/Change Order Status: Passed
In control: Board of Trustees
On agenda: 10/11/2023 Final action: 10/11/2023
Title: Contract: 900 East UVX Design Services (Horrocks Engineers, Inc.)
Attachments: 1. Contract: 900 East UVX Design Services (Horrocks)

TO:                

Board of Trustees

THROUGH:  

Jay Fox, Executive Director

FROM:          

Dave Hancock, Chief Capital Services Officer

PRESENTER(S):

Travis Colledge, Project Manager III

 

 

 

TITLE:                                                                                                                                                                         

title

Contract: 900 East UVX Design Services (Horrocks Engineers, Inc.)

end

 

AGENDA ITEM TYPE:                                                                                                                        

Procurement Contract/Change Order

RECOMMENDATION:                                                                                                                       

Approve and authorize the Executive Director to execute the 900 East UVX design services contract and associated disbursements with Horrocks Engineers, Inc.  in the not-to-exceed amount of $488,618.00.                                           

BACKGROUND:                                                                                                                                 

In the 2023-2027 Five-year Capital Plan, funding has been allocated for the design and construction of two new BRT station platforms on the existing UVX BRT Line on 900 East, near the new BYU music building between Birch Lane and 1100 North.

The station design should match the Type D platforms depicted in the Provo-Orem Transportation Improvement Project Plans. These new platforms will provide additional locations for service particularly on the east side of BYU campus and are to be developed in accordance with UTA standards and specifications.

UTA has selected Horrocks Engineers, Inc to complete the design for these station platforms. The contractor was selected through full and open competition. There were two proposals received. Horrocks was selected as the best qualified at a fair and reasonable price. 

 

DISCUSSION:                                                                                                                                      

UTA has selected Horrocks Engineers, Inc to complete the design for the new station platforms. The contractor was selected through full and open competition. There were two proposals received. Horrocks was selected as the best qualified at a fair and reasonable price. 

 

Project design looks to do the following:

 

1. Design to meet the available funding and physical needs of the Project.

2. Provide construction cost estimates at the preliminary design, design development, construction documents, and bidding phases identified for the Project.

3. Cultivation of a partnering attitude and effective cooperation among the architect/engineer, UTA, Provo City and BYU.

4. Implementation of a Project that is cost-effective; meets the phasing and schedule milestones of UTA; and meets the quality and safety standards recognized by UTA is paramount to the successful completion of the Project.

 

CONTRACT SUMMARY:                                                                                                                   

Contractor Name:                          

Horrocks Engineers, Inc.

Contract Number:                          

23-03750VW

Base Contract Effective Dates:     

10/14/2023 to 1/31/2025

Extended Contract Dates:            

N/A

Existing Contract Value:                

N/A

Amendment Amount:                   

N/A

New/Total Contract Value:

$488,618

Procurement Method:                  

RFQu (Best Qualified)

Budget Authority:                            

2023-2027 Capital Plan

 

 

ALTERNATIVES:                                                                                                                                    

Not developing the design for this location, would delay a needed new stop to serve existing and new customers.

 

FISCAL IMPACT:                                                                                                                                

The 2023-2027 Capital Plan includes funds for UVX stop design services

 

ATTACHMENTS:                                                                                                                                

1.                     Contract