File #: 23-03811-25-024   
Type: Procurement Contract/Change Order Status: Passed
In control: Board of Trustees
On agenda: 9/10/2025 Final action: 9/10/2025
Title: Change Order: On-Call Infrastructure Maintenance Contract Task Order #25-024 - Central Ave. TRAX Grade Crossing Replacement (Stacy and Witbeck, Inc.)
Attachments: 1. Task Order: On-Call Infrastructure Maintenance Contract Task Order #25-024 Central Ave. Grade Crossing Replacement (Stacy and Witbeck, Inc.)

TO:                

Board of Trustees

THROUGH:  

Jay Fox, Executive Director

FROM:          

Jared Scarbrough, Acting Chief Capital Services Officer

PRESENTER(S):

David Osborn, Acting Director of Capital Design and Construction

 

 

TITLE:                                                                                                                                                                         

title

Change Order: On-Call Infrastructure Maintenance Contract Task Order #25-024 - Central Ave. TRAX Grade Crossing Replacement (Stacy and Witbeck, Inc.)

end

 

AGENDA ITEM TYPE:                                                                                                                        

Procurement Contract/Change Order

RECOMMENDATION:                                                                                                                       

Approve and authorize the Executive Director to execute Task Order No. 25-024 and associated disbursements on the on-call infrastructure maintenance task ordering contract with Stacy and Witbeck, Inc. in the amount of $464,013 to replace the grade crossing located at Central Avenue on the North/South TRAX line in Millcreek.                     

BACKGROUND:                                                                                                                                 

In December 2023, UTA released a request for procurement (RFP) 23-03811 for an on-call maintenance contractor focused specifically on infrastructure assets. Bids were received and evaluated, and Stacy and Witbeck, Inc. was selected as the winner based on overall scoring using the best value format. The UTA Board of Trustees approved the contract and authorized the Executive Director to execute the master task ordering agreement (MTOA) with Stacy and Witbeck Inc. on April 18, 2024.  The MTOA is for three (3) years, plus two (2) one-year options, with a total 5-year not-to-exceed value of $45,000,000.

UTA’s rail infrastructure is at an age where rehabilitations and replacements need to occur to maintain the infrastructure in a state of good repair. Not only will we replace the grade crossing, but we will fix broken rail during the project.  These projects typically address three concerns:

-                     Passenger ride quality

-                     Automobile cross-traffic ride quality

-                     Potential stray current issues

DISCUSSION:                                                                                                                                      

UTA Staff is requesting approval of Task Order 25-024 with Stacy Witbeck, Inc. to complete the removal and replacement of the Central Avenue (approximately 4100 South) grade crossing on the North/South TRAX line in the amount of $464,013.

The scope of this request includes all time, labor, and other items needed to remove existing crossing and replace it with embedded trackwork.

By embedding the crossing, we extend the useful life, provide new rail, and create a smoother ride for both passengers and the driving public. This Task Order has been determined to be within the scope of the Master Task Ordering Agreement. The Task Order pricing has been determined to be fair and reasonable based on both a UTA independent cost estimate and  a price analysis.

 

CONTRACT SUMMARY:                                                                                                                   

Contractor Name:                          

Stacy and Witbeck, Inc.

Contract Number:                          

23-03811-25-024

Base Contract Effective Dates:     

MTOA: April 19, 2024 through December 31, 2027

Task Order: Through December 31, 2025

Extended Contract Dates:            

N/A

Existing Contract Value:                

$21,845,970

Amendment Amount:                   

$464,013

New/Total Contract Value:

$22,309,983

Procurement Method:                  

RFP Best Value

Budget Authority:                            

Approved 2025 Capital Budget

 

 

 

ALTERNATIVES:                                                                                                                                    

Not replacing the crossing. This could lead to rough roadway interface and unplanned shutdowns.

FISCAL IMPACT:                                                                                                                                

The 2025 approved budget for SGR393 includes $5,500,00.00 for UTA’s Grade Crossing rehabilitations and replacements. This project is anticipated to occur in 2025 and covers procurement for these replacement projects.

These costs will be offset by using federal grant funds. These funds are part of UTA’s yearly apportionment. 

                     2025 Contract Total: $464,013

​Total Master Task Ordering Agreement Not-to-Exceed Value: $45,000,000

Total Master Task Order Agreement Remaining Balance:  $22,690,017